Toyo Engineering Corp. is in charge of part of the engineering and offshore supply services. On the other hand, PT. Inti Karya Persada Tehnik, TOYO’s Indonesian subsidiary, is responsible for engineering, procurement and construction (EPC) work, respectively. The plant is scheduled for completion in 2020.
Starting from the original ethylene plant in the 1990s, and a butadiene plant as well as ethylene expansion in the last half decade, TOYO is now executing several projects, such as a polyethylene production plant with a total capacity of 400 000 tpy for CAP, a synthetic rubber plant with a total capacity of 120 000 tpy for PT. Synthetic Rubber Indonesia (a joint venture between Michelin and PT Styrindo Mono Indonesia, a subsidiary of CAP) and butadiene expansion project to increase total production capacity from 100 000 tpy to 137 000 tpy for PT Petrokimia Butadiene Indonesia (PBI), a subsidiary of CAP.




