Both projects are executed on EPCC lump sum turnkey basis and shall be carried out concurrently. The consortium, under the leadership of TechnipFMC, is responsible for licensing, basic engineering, detailed engineering, construction and commissioning of the two complexes within a period of 36 months.
Tags:Downstream news

Anna Nicklin
Assistant Editor
Anna joined Palladian Publications in July 2016 and is currently working as an assistant editor on Hydrocarbon Engineering magazine. She is excited at the prospect of enhancing her industry knowledge through this role.
Anna recently graduated from the University of Nottingham with a first class BA (Hons) degree in English and Philosophy, where she spent much of her time editing articles for a student magazine.
Currently living in Camberley, Anna enjoys cooking, exercising and travelling in her spare time.
Share this article



