The scope of this contract, which will have a duration of 48 months, includes engineering, procurement, construction and assistance with commissioning in two packages.

The first package will include isomerisation, naphtha hydro-treatment, CCR, interconnections, flare system and buildings. The second package includes utilities and offsites.