This plant was built by Wison Engineering through an engineering, procurement and construction (EPC) contract.

This project is the first large-size chemical project brought online during the period when China is in the process of restarting the economy while fighting the COVID-19 pandemic.

This plant is deployed with Honeywell UOP's advanced MTO/OCP reaction technologies and Wison Engineering's olefin recovery and separation technology – ‘Pre-cutting + Oil Absorption’ process.